In Aircrete Europe plants, the machinery has long been flexibly built to make sure that it might entire-mechanically cope with packs of slim cladding panels as easily as large structural wall panels (Fig. six). Therefore, in terms of labour, there isn't any significant impact if, such as, sixty consecutive cakes of a similar panel or a number of ca